MY字典>英语词典>belt up翻译和用法

belt up

英 [belt ʌp]

美 [belt ʌp]

网络  别出声; 安静些

英英释义

verb

双语例句

  • By analyzing of dynamic phenomena, mechanisms and movement laws for belt conveyor, the finite element model of conveyor belt is set up, the longitudinal dynamic characteristic of system is analyzed, thereby control and optimization in the course of starting and braking are realized.
    通过对带式输送机的动力学现象、机理及运动规律的分析,建立了输送带的有限元力学模型,分析了系统的纵向动态特性,从而实现了对起动、制动等过程的控制和优化。
  • The reminding value for the tensile force of the binding belt can be set up at will, thereby being flexible and convenient to use.
    本实用新型捆绑带张紧力提示值可以任意设定,使用灵活方便。
  • Several methods for detecting and treating the fault from cable breakage in cable belt were summed up in this paper.
    归纳了对钢绳芯胶带断丝检测和处理的几种方法。
  • I should have done my seat belt up tighter, and not looked out of the window, not leaned over so far.
    这次我又没有听她的话,不该把安全带系得那么松,不该朝窗外看,不该把身子倾得那么厉害。
  • Now you are out of work, you'll have to tighten your belt and give up buying new clothes and going out so often.
    你现在失去工作,应该勒紧裤头节约点,不要经常出去逛街,买衣服了。
  • The groom throws his new wife's garter belt up in the air, the boy to catches the belt will be the next one to get married.
    在婚礼仪式上,新郎背对一群未婚男士,把他的新婚妻子的吊袜带向空中抛去,人们说接住新郎抛来的吊袜带的男孩将是下一位结婚的新郎。
  • Due to the fact that both in transportation as well as in handling, conveyor belt are therefore made up by bonding together a number of conveyor belt sections through vulcanization. Each conveyor belt has at least one and generally a number of splices.
    因为受到装载与运输的限制,输送带是由许多部分通过硫化处理连接而成的,每条输送带至少有一个或多个接头。
  • Chambers waved his hand. 'Belt up!' he snapped.
    钱伯斯手一挥,喝道:“闭嘴!”
  • Several aisles away, in the middle of the store, I see a conveyor belt carrying gold-colored boxes up to a second floor.
    我看到几个过道之外、商场的中间有个传送带正把一些金黄色的盒子传送到二楼。
  • It shows that the measured values are in the design of control; When post pouring belt is not set up between the chord and the floor, the floor which undertakes part of prestress should be considered.
    进行了叠层转换桁架施工过程实测,分析表明叠层转换桁架实测值在设计的控制范围内;当楼板与弦杆之间未设置后浇带时,应考虑楼板承担一部分预应力。